Cabin kitchen: finished Friday, May 11, the day Nate said in February. $28,750.…

saved May 13, 2018 10:30date May 13, 2018
2linked records
3named, not linked
2questions

What it says

Cabin kitchen: finished Friday, May 11, the day Nate said in February. $28,750.00 in all, paid in three parts; the last cheque went to him Friday. No extras and no change orders. - PAINT, walls: Benjamin Moore Guilford Green, HC-116, in the kitchen finish. Trim: Simply White, OC-117. Nate's painter left a labelled quart of each under the sink. - Counters: quartz. Hot pans NOT directly on it, per Nate, whatever the brochure says. - Floor: vinyl plank. Damp mop only. - The window over the sink is four feet wide. I can see the island, the loons' end of the lake and most of the dock. - The dishwasher must be drained and left open at closing; it is on Ray's list now. - The range is propane and lights itself. - The breaker panel is unchanged and still in the hall closet; the kitchen now has four circuits of its own, labelled. - Nate's work is guaranteed for a year, to May 2019. Where things are: plates left of the sink, glasses right, pots in the deep drawers under the range, the lefse griddle in the tall cupboard by the back door, which was built to fit it.

Name a person or thing it links to · Name one it names without a link

Fields

Date2018-05-13 10:30

Linked to

2 records, 3 more named

→ the link goes from this record; ← it comes from the other one. These are the edges the build gives the app. A name in the text is only a match on the words and is never treated as a link.

Comments

0

Comments are added in the local viewer; this copy is read-only.

Questions that use it

2
q051 What colour is the kitchen? I need a quart for touching up. q078 What colour did we paint the bedrooms at the cabin?

In the app

missing

From the app's own code (viewer/app_export.sh): Not made yet: run viewer/app_export.sh retired-couple.

One step out

note_subject ←The cabin, Skein Lake — Property; note_subjectThe cabin, Skein Lakenote_subject ←Nate Lahti — Contact; note_subjectNate LahtiCabin kitchen: finished Frida…

As the app receives it

1

The graph nodes the build makes for it: the record, and its phones, emails, addresses, pictures and files.

{
 "$type": "n_type_note",
 "id": "n_note_cabin_kitchen_done",
 "createdAt": "1526207400000",
 "date": "2018-05-13T10:30:00.000Z",
 "body": "Cabin kitchen: finished Friday, May 11, the day Nate said in February. $28,750.00 in all, paid in three parts; the last cheque went to him Friday. No extras and no change orders.\n\n- PAINT, walls: Benjamin Moore Guilford Green, HC-116, in the kitchen finish. Trim: Simply White, OC-117. Nate's painter left a labelled quart of each under the sink.\n- Counters: quartz. Hot pans NOT directly on it, per Nate, whatever the brochure says.\n- Floor: vinyl plank. Damp mop only.\n- The window over the sink is four feet wide. I can see the island, the loons' end of the lake and most of the dock.\n- The dishwasher must be drained and left open at closing; it is on Ray's list now.\n- The range is propane and lights itself.\n- The breaker panel is unchanged and still in the hall closet; the kitchen now has four circuits of its own, labelled.\n- Nate's work is guaranteed for a year, to May 2019.\n\nWhere things are: plates left of the sink, glasses right, pots in the deep drawers under the range, the lefse griddle in the tall cupboard by the back door, which was built to fit it.\n"
}

Source

personas/retired-couple/records/notes-2018-2020.yaml:84

- id: note-cabin-kitchen-done
  kind: note
  about: [cabin, nate-lahti]
  date: 2018-05-13 10:30
  body: |
    Cabin kitchen: finished Friday, May 11, the day Nate said in February. $28,750.00 in all, paid in three parts; the last cheque went to him Friday. No extras and no change orders.

    - PAINT, walls: Benjamin Moore Guilford Green, HC-116, in the kitchen finish. Trim: Simply White, OC-117. Nate's painter left a labelled quart of each under the sink.
    - Counters: quartz. Hot pans NOT directly on it, per Nate, whatever the brochure says.
    - Floor: vinyl plank. Damp mop only.
    - The window over the sink is four feet wide. I can see the island, the loons' end of the lake and most of the dock.
    - The dishwasher must be drained and left open at closing; it is on Ray's list now.
    - The range is propane and lights itself.
    - The breaker panel is unchanged and still in the hall closet; the kitchen now has four circuits of its own, labelled.
    - Nate's work is guaranteed for a year, to May 2019.

    Where things are: plates left of the sink, glasses right, pots in the deep drawers under the range, the lefse griddle in the tall cupboard by the back door, which was built to fit it.