The cabin, Skein Lake
Cabin windows: eleven new ones, finished yesterday, September 22. Nate Lahti's…
saved Sep 23, 2023 11:00date Sep 23, 2023
1linked record
2named, not linked
1question
note-cabin-windows-2023
What it says
Cabin windows: eleven new ones, finished yesterday, September 22. Nate Lahti's crew, nine working days. $13,600.00.
Which: every window but the big one over the kitchen sink, which was new in 2018. Three in the main room, two in each bedroom, one in the bathroom, one in the hall.
Double-pane, wood inside, green metal outside. They tilt inward to wash; two catches at the top of each sash, pushed toward the middle.
Guarantees, per the paper Nate left: 20 years against fogging between the panes; 10 on the frames and the hardware; 2 on his own work.
- Three of the sills were soft and were rebuilt.
- Screens come out from inside. They may stay in all winter.
- Do not paint the weatherstrip. (He looked at Ray.)
The storm panels, 22 of them, went away on Nate's trailer.
The shed: Nate came and looked. Sound, dry, 12 x 16, on a slab. He will send a price over the winter.
Name a person or thing it links to · Name one it names without a link
Fields
| Date | 2023-09-23 11:00 |
|---|
Linked to
1 record, 2 more named→ the link goes from this record; ← it comes from the other one. These are the edges the build gives the app. A name in the text is only a match on the words and is never treated as a link.
Comments
0
Comments are added in the local viewer; this copy is read-only.
Questions that use it
1
q086 Did we ever replace the torn screen in the lake bedroom?
In the app
missing
From the app's own code (viewer/app_export.sh): Not made yet: run viewer/app_export.sh retired-couple.
One step out
As the app receives it
1
The graph nodes the build makes for it: the record, and its phones, emails, addresses, pictures and files.
{
"$type": "n_type_note",
"id": "n_note_cabin_windows_2023",
"createdAt": "1695466800000",
"date": "2023-09-23T11:00:00.000Z",
"body": "Cabin windows: eleven new ones, finished yesterday, September 22. Nate Lahti's crew, nine working days. $13,600.00.\n\nWhich: every window but the big one over the kitchen sink, which was new in 2018. Three in the main room, two in each bedroom, one in the bathroom, one in the hall.\n\nDouble-pane, wood inside, green metal outside. They tilt inward to wash; two catches at the top of each sash, pushed toward the middle.\n\nGuarantees, per the paper Nate left: 20 years against fogging between the panes; 10 on the frames and the hardware; 2 on his own work.\n\n- Three of the sills were soft and were rebuilt.\n- Screens come out from inside. They may stay in all winter.\n- Do not paint the weatherstrip. (He looked at Ray.)\n\nThe storm panels, 22 of them, went away on Nate's trailer.\n\nThe shed: Nate came and looked. Sound, dry, 12 x 16, on a slab. He will send a price over the winter.\n"
}
Source
personas/retired-couple/records/notes-2023-2024.yaml:274
- id: note-cabin-windows-2023
kind: note
about: [cabin]
date: 2023-09-23 11:00
body: |
Cabin windows: eleven new ones, finished yesterday, September 22. Nate Lahti's crew, nine working days. $13,600.00.
Which: every window but the big one over the kitchen sink, which was new in 2018. Three in the main room, two in each bedroom, one in the bathroom, one in the hall.
Double-pane, wood inside, green metal outside. They tilt inward to wash; two catches at the top of each sash, pushed toward the middle.
Guarantees, per the paper Nate left: 20 years against fogging between the panes; 10 on the frames and the hardware; 2 on his own work.
- Three of the sills were soft and were rebuilt.
- Screens come out from inside. They may stay in all winter.
- Do not paint the weatherstrip. (He looked at Ray.)
The storm panels, 22 of them, went away on Nate's trailer.
The shed: Nate came and looked. Sound, dry, 12 x 16, on a slab. He will send a price over the winter.