The cabin, Skein Lake
The porch: finished yesterday, June 25. Paid in full, $19,400.00 in all.
saved Jun 26, 2021 16:15date Jun 26, 2021
1linked record
2named, not linked
1question
note-porch-done-2021
What it says
The porch: finished yesterday, June 25. Paid in full, $19,400.00 in all.
- 14 x 20 feet. Cedar floor. Green steel roof to match.
- FLOOR FINISH: Cabot Australian Timber Oil, the colour called Natural. One coat now; again next June, and every second year after. Nate left the half can in the boathouse.
- Posts, rails and the screen frames are stained to match the cabin's siding: Sikkens, Butternut.
- Four outlets, on their own breaker, labelled PORCH in the panel.
Name a person or thing it links to · Name one it names without a link
Fields
| Date | 2021-06-26 16:15 |
|---|
Linked to
1 record, 2 more named→ the link goes from this record; ← it comes from the other one. These are the edges the build gives the app. A name in the text is only a match on the words and is never treated as a link.
Comments
0
Comments are added in the local viewer; this copy is read-only.
Questions that use it
1
q078 What colour did we paint the bedrooms at the cabin?
In the app
missing
From the app's own code (viewer/app_export.sh): Not made yet: run viewer/app_export.sh retired-couple.
One step out
As the app receives it
1
The graph nodes the build makes for it: the record, and its phones, emails, addresses, pictures and files.
{
"$type": "n_type_note",
"id": "n_note_porch_done_2021",
"createdAt": "1624724100000",
"date": "2021-06-26T16:15:00.000Z",
"body": "The porch: finished yesterday, June 25. Paid in full, $19,400.00 in all.\n\n- 14 x 20 feet. Cedar floor. Green steel roof to match.\n- FLOOR FINISH: Cabot Australian Timber Oil, the colour called Natural. One coat now; again next June, and every second year after. Nate left the half can in the boathouse.\n- Posts, rails and the screen frames are stained to match the cabin's siding: Sikkens, Butternut.\n- Four outlets, on their own breaker, labelled PORCH in the panel.\n"
}
Source
personas/retired-couple/records/notes-2021-2022.yaml:131
- id: note-porch-done-2021
kind: note
about: [cabin]
date: 2021-06-26 16:15
body: |
The porch: finished yesterday, June 25. Paid in full, $19,400.00 in all.
- 14 x 20 feet. Cedar floor. Green steel roof to match.
- FLOOR FINISH: Cabot Australian Timber Oil, the colour called Natural. One coat now; again next June, and every second year after. Nate left the half can in the boathouse.
- Posts, rails and the screen frames are stained to match the cabin's siding: Sikkens, Butternut.
- Four outlets, on their own breaker, labelled PORCH in the panel.