Nate Lahti
The cabin has a new kitchen. Nate Lahti finished on Friday, on the day he said…
saved May 13, 2018 19:10date May 13, 2018
2linked records
What it says
The cabin has a new kitchen. Nate Lahti finished on Friday, on the day he said he would, and we slept there last night for the first time since the walls came out.
Now the wall to the main room is gone, there are cabinets I can reach, and over the sink there is a window four feet wide that looks straight down the lake. I stood at it this morning for some time with the tap running.
When Nate found the wiring behind the old stove he came and showed it to R. before he touched it, which is how to handle R.
Mother's Day. All three called, in order.
Name a person or thing it links to · Name one it names without a link
Fields
| Date | 2018-05-13 19:10 |
|---|
Linked to
2 records→ the link goes from this record; ← it comes from the other one. These are the edges the build gives the app. A name in the text is only a match on the words and is never treated as a link.
Comments
0
Comments are added in the local viewer; this copy is read-only.
In the app
missing
From the app's own code (viewer/app_export.sh): Not made yet: run viewer/app_export.sh retired-couple.
One step out
As the app receives it
1
The graph nodes the build makes for it: the record, and its phones, emails, addresses, pictures and files.
{
"$type": "n_type_journal_entry",
"id": "n_journal_2018_05_13",
"createdAt": "1526238600000",
"date": "2018-05-13T19:10:00.000Z",
"body": "The cabin has a new kitchen. Nate Lahti finished on Friday, on the day he said he would, and we slept there last night for the first time since the walls came out.\n\nNow the wall to the main room is gone, there are cabinets I can reach, and over the sink there is a window four feet wide that looks straight down the lake. I stood at it this morning for some time with the tap running.\n\nWhen Nate found the wiring behind the old stove he came and showed it to R. before he touched it, which is how to handle R.\n\nMother's Day. All three called, in order.\n"
}
Source
personas/retired-couple/records/journal-2016-2019.yaml:440
- id: journal-2018-05-13
kind: journal_entry
about: [cabin, nate-lahti]
date: 2018-05-13 19:10
body: |
The cabin has a new kitchen. Nate Lahti finished on Friday, on the day he said he would, and we slept there last night for the first time since the walls came out.
Now the wall to the main room is gone, there are cabinets I can reach, and over the sink there is a window four feet wide that looks straight down the lake. I stood at it this morning for some time with the tap running.
When Nate found the wiring behind the old stove he came and showed it to R. before he touched it, which is how to handle R.
Mother's Day. All three called, in order.